HPMV project: MASTERIS supports the admission of BB60000 to the Marseille—Ventimiglia line

As part of the High Performance Marseille—Ventimiglia (HPMV) project, MASTERIS acts as a Project Management Assistant (AMOA) alongside SNCF Voyageurs Matériel and on behalf of SNCF Réseau, in order to allow the admission of BB60000 locomotives to this strategic axis. This project aims to modernize the line in preparation for the arrival of the system. ERTMS Level 2 by 2028.

 

A technical and strategic challenge: to make the BB60000 operate on an international line

The Marseille-Ventimiglia line has a unique specificity: although it is managed by the SNCF Group, it crosses a few kilometers of Italian territory. However, the BB60000 locomotives (assigned to network maintenance missions) were never authorized to operate there.

This situation represents a major challenge: without these locomotives, maintenance operations cannot be ensured, putting the continuous operation of the line at risk. Hence the need to conduct an admission process allowing these locomotives to circulate in Italy.

 

The HPMV project: preparing the line for ERTMS Level 2

The HPMV program provides for the gradual equipment of the Marseille-Ventimiglia line with ERTMS Level 2 from 2028. This European standard aims to harmonize rail signalling and improve network performance.

Ultimately, any autonomous rolling stock on this line must be compatible with this level of signaling. This is why the BB60000 will be equipped with an ERTMS/KVB bi-standard system, in order to ensure their transition to the new standard while remaining compatible with the existing one.

 

Three Authorization Phases for the BB60000

The BB60000 admission project consists of three main stages:

  1. Phase 0: modification of the existing authorization up to the Ventimiglia border point for unmodified gear.
  2. Phase 1: authorization for locomotives equipped with ERTMS Level 1 + KVB, upon receipt of the first two production vehicles.
  3. Phase 2: ERTMS Level 2 authorization on the pilot section (Cannes—Grasse) and up to Ventimiglia.

Today, the contract managed by MASTERIS covers The phases 0 and 1.

 

MASTERIS, a key player in admission

In this complex project, MASTERIS plays a central role in supporting the certification and driving authorization procedures for BB60000 in France and Italy.

Its missions include:

  • The collection of test reports and technical evidence.
  • The definition and monitoring of a detailed production plan.
  • Coordination with independent evaluators to ensure regulatory compliance and safety

Thanks to this mobilization, the BB60000 will be able to, For the first time, circulate on Italian territory, thus ensuring their access to the Ventimiglia International Station.

 

A major deadline: end of contract expected in 2027

The finalization of the project is scheduled for End of 2027, by which time the BB60000 should be fully operational along the entire Marseilles — Ventimiglia route.

other customer cases

They trust us, their projects bear witness to it

Concrete support, measurable results

See all references

MASTERIS wins the CITADIS bogie market in Rouen

MASTERIS signs a new contract with Eurostar

MASTERIS and Keolis Lille Ilevia continue their collaboration

Renovation of the Support Bars of the Tours Tramway: A Project of Industrial and Artistic Excellence!

MASTERIS wins the public tender for the maintenance of Aubagne trains

MASTERIS renovates the HVAC cabins of 21 Citadis trains

MASTERIS in AMOA for the admission of BB60000 on the Marseille—Ventimiglia line as part of the HPMV project

MASTERIS supports HEXAFRET in maintaining ERTMS/KVB in Operational Conditions on the BB27000

Rouen Normandy Metropolis: General Overhaul of Citadis 402 Tramway Bogies

TaM Montpellier 3M: Mid-life renovation of doors on Citadis 401 trams

European Metropolis of Lille: Mid-life operation for VAL 206 metro trains

General Overhaul of SIRIO Brakes for RATP Florence

Transdev Dublin - Expertise of a tram train following a collision

Thalys updates its 17 PBKA oars

Eurostar equips its E300 trains with ERTMS

MASTERIS SOLEA in the repair of a tram-train following an accident

In Dakar, we are far from major European rail networks, so in the event of incidents it is important to be able to react quickly and independently. This is why it was important to improve the skills of the teams in lifting our Coradia machines and our work trains. MASTERIS was able to respond quickly and effectively to our expectations.

Anonymous
SETER Technical Manager

Within Hexafret, regulatory monitoring already exists on which ECE relies. However, it proved necessary to complete this monitoring in order to cover all the countries in which Hexafret operates, in particular Germany, Spain and Italy. Hexafret therefore turned to MASTERIS in 2024 to provide this service.

After a first year of collaboration, Hexafret satisfied with both the content and the contractual relationship, extended the regulatory monitoring contract in 2025. We appreciate its synthetic side.

Michel Lafont
Maintenance Management System Manager
Paysage avec train

Your rolling stock, always on track.

Let's discuss your project together: a dedicated expert accompanies you at each stage.

Contact an expert