} Update cookies preferences

MASTERIS wins a €20M contract with CFL

May 6, 2020
Read Time
Min
summary

Text Link

CFL entrusts MASTERIS with the ATP of its TER 2NNG bogies and trainsets

Mid-life refurbishment of rolling stock

Luxembourg Railways (CFL) has just entrusted MASTERIS with the ATP (Other Scheduled Works) for 132 bogies from their 21 Z2200 (TER2NNG) trainsets.

These overhaul operations take place at the 1.8 million kilometer mark. These works are classified as "ATP" because they are not part of the standard maintenance cycle for this type of trainset. They serve as a form of mid-life bogie refurbishment, restoring them to a condition equivalent to that of a new bogie.

These operations will be carried out by the Nevers Industrial Technicentre, a facility in charge of industrial maintenance for rolling stock and the repair and refurbishment of key railway components (axles, bogies, compressors, upholstery, etc.).

The CFL TER2NNG

A contract that continues work begun with CFL in late 2018

Signed on May 28th, the contract finalized a long process that began in late 2018 and concluded during the lockdown period. It mobilized numerous internal and external stakeholders to ensure the client's expectations were met as effectively as possible.

CFL, a major client for MASTERIS

With this significant commitment, CFL has renewed its trust in MASTERIS, which already manages, among other things, the marketing of overhaul services for CFL's repairable rolling stock parts.

resources

Resources and news

See resources
Paysage avec train

Your rolling stock, always on track.

Let's discuss your project together: a dedicated expert accompanies you at each stage.

Contact an expert